Reconstruction of technology in Park Inn by Radisson Danube

Bratislava, 16 July 2018

Design, supply and installation of HVAC and heating systems, minor construction works and other activities – all this was carried out by ENGIE Services’ Technology Installation Department as part of the complex reconstruction of the Danube Hotel in 2017.

“We have serviced technical equipment for Hotel Danube in the past. Based on our positive experience, we were therefore approached with an offer of partnership and design activities in this area as part of a complex reconstruction. At the beginning of the project, we carried out a framework energy audit. This led to proposals for retrofitting, i.e. the renovation of the technical equipment, and subsequently to a contract for the work.” Milan Pavle, key account manager, ENGIE Services, describes the cooperation with the investor. Hand in hand with the extensive reconstruction of eight floors of the hotel with a number of small individual operations, retrofits and new installations of technical equipment such as HVAC (heating, ventilation, air-conditioning), low-current electricity installations, MaR (measurement and control) and EPS (electrical fire alarm system) were also carried out. The complexity of the project was that it turned from a technical property management contract into an installation project with a total volume of 2.5 million euros.

“This meant that we had to focus a lot of attention and technical know-how in the design phase on matching the legacy equipment with the new equipment and measurement and control systems. In the construction phase, again, there was a great deal of emphasis on operability and flexibility, especially in meeting deadlines. It was also necessary to establish continuity between the various activities so that the different professions could be seamlessly linked. In addition, the work was coordinated by the general contractor, so the investor’s requirements came gradually and often had to be incorporated on the fly.” explains Marián Horov, Senior Project Manager HVAC, ENGIE Services. Currently, the installation project is already complete and the equipment is fully operational. The cooperation continues with the provision of servicing of technical equipment and overall technical management of the hotel facilities.

Leave a Reply

Your email address will not be published. Required fields are marked *


Engie