Start of activity

1996

Total installed power

212,6 MW

Installed capacity: biomass

12,7 MW

Annual heat production

261.5 GWh

Number of boiler rooms

144

Length of wiring

100.4 km

Services provided

  • Production and distribution of heat and hot water

Complaints handling

Modernisation of the heat management of the Bratislava-Vrakuňa Municipal District

  • Description of the solution
    Connection of houses that are currently supplied with heat from gas boiler rooms on Bebravská, Čiližská and Rajčianská streets – to the boiler room on Železničná Street, which produces heat preferably from renewable sources (wood chips).
    The houses will be connected with new pre-insulated pipelines with higher efficiency – with a transition to a two-pipe system (currently the supply is provided by an inefficient three-pipe system from the time of the construction of the housing estate).
    The existing boiler rooms (for hot water preparation) in the houses will be replaced by new compact heat transfer stations.
  • Heat transfer station (OST)
    OST is a modern device for heat transfer and hot water preparation directly in the apartment building. The station is equipped with an automatic control, which can be adjusted according to the requirements of a particular apartment building.
  • How long will the modernisation take?
    The entire construction is planned to take about a year. The work is expected to start in spring 2027. Station replacements and house connections will be carried out in the summer months, outside the heating season.
  • What limitations will this bring in the heat supply?
    We anticipate several shutdowns during the summer months. Their length should not exceed a few days. Only a short shutdown is foreseen for the replacement of boiler room technology in the apartment building for the installation of OST. Generally 1 to 3 days.
  • Current status
    The boiler house on Železničná Street produces heat mainly from wood chips and delivers it through pipelines that are up to 50 years old. Despite repairs, the system is faulty and requires complete reconstruction.
    The boiler houses on Bebravská, Čiližská and Rajčianská Streets produce heat on the basis of natural gas.
  • Legislation requirements for renewable energy sources (RES)
    Connecting the existing gas boiler houses Bebravská, Čiližská and Rajčianska to the Železničná boiler house will significantly increase the number of customers for whom heat will be produced from a renewable source – wood chips. After the modernisation is completed, the Vrakuňa district will form an effective CZT (centralised heat supply). Most of the heat will be produced from wood chips. Currently, the topic of ETS 2 is open, which will bring air pollution payments for individual consumers. Part of the heat produced from wood chips will be exempted from this payment, which will have a positive impact on the resulting heat costs for consumers.
  • Subsidies

    TERMMING has submitted an application for co-financing of an investment under “Call No MoF 2-2024 from the Modernisation Fund to support investments for the modernisation of energy systems, including energy storage and energy efficiency improvements”.

    Thanks to the support and good cooperation with the Bratislava Vrakuňa Municipality, our application was successful. We received a favourable financial contribution of almost 85% of the investment costs.

    Information on the granting of subsidies from the Environmental Fund
    MoF0139242946 | Central Register of Contracts

  • Such an opportunity is particularly unique in the level of support. This will allow to optimize the price of heat despite the high investment. The rest of the investment is financed by TERMMING, a.s. (ENGIE Services, a.s.)

  • Quality of supply
    The modernisation of the heat management system will improve the quality of heat supply for heating and hot water. The replacement of existing technical equipment will increase its reliability and reduce the number and duration of interruptions to heat supply due to technical equipment failures.
  • The flexibility of the
    OST (heat transfer station) installed for individual points of use will allow customers to individually set the preparation and delivery of hot water (for example, whether hot water will be supplied 24 hours a day or in a different mode). Similarly, it will be possible to adjust the heating parameters on the OST.
  • Price of heat
    The price of heat produced from wood chips is more favourable in the long term than from gas. At the same time, the efficiency of the distribution system will be increased and the preparation of heat and hot water will be more efficient. For these reasons, we anticipate a 10% reduction in the price of heat after the renovation.
  • Consent to install OST
    As the current technology is majority owned by the house, consent is required to replace the outdated technology with new technology. The latter will be owned by TERMMING,a.s. so that all costs associated with the operation (e.g. repairs and maintenance, necessary inspections, etc.) will be borne by the heat supplier. All OST will be monitored 24 hours a day and connected to the central control room of TERMMING.
  • What if we want to have our own OST?
    It is possible, but not convenient. The occupants of the house have to provide their own financing for the investment, then provide operation, maintenance, inspections, meter verifications and parameter adjustments. The price of the heat will remain the same as if the OST is financed by TERMMING. This is how it is determined by the legislation in force.
  • What impact will this modernisation have on the current regulation of houses?
    The substations are designed with respect to the existing heat distribution systems of the apartment buildings. Each station is adjusted after installation according to the current parameters of the system. In the case of houses that have already been regulated, the station is set according to the house regulation project.
  • What if we want to build our own RES (photovoltaic, solar). Is it possible to connect it?
    TERMMING supports production from renewable sources. Therefore, we will not hinder plans to connect a solar system. We are ready to deal with each such case individually, also with regard to the current legislation.
  • What if we don’t agree to build OST at all?
    Boiler room modification is a necessary part of the modernization that will bring practically only benefits. We are open to the possibility of individual boiler room modification solutions, which will be provided by the owners of the apartment building at their own cost and risk. However, it is necessary to keep within the parameters so that the whole system works properly.
  • How will the connection to the house’s electrical system be resolved?
    The OST will be connected to the existing electrical distribution system of the house, either with sub-metering, which will be subsequently charged by the administrator to the heat supplier (TERMMING). The second option is a separate tapping point, which will be set up directly by TERMMING for this purpose, if technically feasible. Residents will not be burdened with electricity costs for OST.
  • Who will take care of the OST?
    After the reconstruction, TERMMING assumes full responsibility for the operation and maintenance of the OST at its own expense, respecting the rights of the owners. The OST will be monitored 24/7 by TERMMING’s central control room. Any anomaly or malfunction will in most cases be dealt with before it becomes apparent.
    The same applies to the setting of parameters that will respect the agreements with the administrator and the respective apartment building. These may relate to the equithermal curve, media temperatures, etc.
  • Are we able to decide on the setting of OST parameters for hot water preparation as before?
    Yeah. And not only hot water, but also heating parameters, which until now has been severely limited. Each house can be set according to the individual requirements of the occupants of that house (equithermal curve, setback times, outlet water temperature, etc.).

24/7 dispatching

dispecing.sk@engie.com 0850 364 431 / 0850 ENGIE 1

Address

TERMMING, a. s.
Jarošova 1
831 03 Bratislava
  Look on the map

Address

TERMMING, a. s.
Radničné námestie No.9
902 14 Pezinok
  Look on the map

Address

TERMMING, a. s.
Kollárova 375/17
901 01 Malacky
   Look on the map

Dispatching

  +421 34 77 235 11

Address

TERMMING, a. s.
Ružová 1643/5
900 31 Stupava
  Look on the map

Contact

  info.sk@engie.com

Dispatching

  +421 34 77 235 11

Address

TERMMING, a. s.
Školská 592/2
972 17 Kanianka
  Look on the map

Address

TERMMING, a. s.
Suchý potok 564/5
Lehota pod Vtáčnikom
  Look on the map

Address

TERMMING, a.s.
P.O.Hviezdoslava 1642/112
079 01 Veľké Kapušany
Look on the map

Address

TERMMING, a. s.
Továrenská 531
905 01 Senica
   Look on the map

Address

TERMMING, a. s.
Mallého 977/58
909 01 Skalica

   Look on the map

IČO: 35 972 254
DIČ : 2022102126
DPH: SK2022102126 

IBAN: SK46 1100 0000 0026 2000 4693 (TERMMING a.s.)

IBAN: SK18 7500 0000 0040 2087 0300 (TERMMING a.s., Senica)

IBAN: SK78 0200 0000 0011 6794 5182 (TERMMING a.s., Skalica)

Environment Fund: expansion of biomass use for heat production in Senica by connecting the circuits of boiler houses PK1, PK2, PK4, PK7 and the Municipal Heating Plant; renewal of secondary heat distribution systems for gas boiler houses PK-1, 2, 4 and 7

Environmental fund: multifunctional complex Zátišie-PS 01 Heat pump engine room

Environment Fund: reconstruction of the primary heat distribution system between the shaft on Brnenska str. and OST 2 in Malacky

Invitation to tender: ‘Construction, reconstruction and modernisation of heat distribution systems in the municipality of Kanianka’

Project of construction, reconstruction and modernisation of heat distribution systems in the village of Kanianka (jpg)

URSO Price Decision No: 0200/2025/T valid from 7.3.2025 to 31. 12. 2027. This Decision applies to the following locations:

Correction_0200_2025_T

  • for sampling points in the Bratislava city districts of Devínska Nová Ves, Záhorská Bystrica, Nové Mesto, Ružinov, Staré Mesto, Karlova Ves, Petržalka, Podunajské Biskupice, Vrakuňa, Dúbravka
  • for sampling points in the following towns and villages: Malacky, Stupava, Báhoň, Lehota pod Vtáčnikom, Pezinok, Košice, Veľké Kapušany, Kanianka, Trnava.

Price decision URSO: no.0167/2024/T with effect from 1 January 2024 by the end of the 6th regulatory for customer locations in Senica, Smrdáky, Gbely, Holíč, Skalica.

Regulated entity TERMMING, a.s., Jarošova 2961/1, 831 03 Bratislava, ID No. 35 972 254 for the operation of EcoPoint Office CenterĽ Magnezitárska ulicaĽ Košice has decision No. 0150/2018/E of 18 December 2017 as amended by decision 0222/2019/E of 11 December 2017. 12. 2019 with effect from 01. 01. 2020 to 31. 12. 2021 as follows:

Price decision URSO: no-0173/2024/T m e n i decision no. 0252/2023/T dated 28.12.2022 with effect from 1 January 2024 by the end of the 6th regulatory for consumption points in the Bratislava – Staré Mesto, Ružinov, Karlova Ves and Petržalka, Podunajské Biskupice and Vrakuňa in Malacky and Stupava, Košice, Veľké Kapušany, for consumption points in the Kanianka municipality.

Pricing Decision No. 0252/2023/T dated 28.12.2022 for the period from 1 January 2023 to 31 December 2023 with validity until the end of the 6th regulatory period for customer sites in the Bratislava – Devínska Nová Ves and Záhorská Bystrica, Bratislava – Nové Mesto, Bratislava – Staré Mesto, Ružinov, Karlova Ves and Petržalka, Bratislava – Podunajské Biskupice and Vrakuňa, Malacky, Stupava, Báhoň, Lehota pod Vtáčnikom, Pezinok, Košice, Trnava districts.

Pricing Decision No. 0379/2022/T dated 11.11.2022 with effect from 1. December 2022 by the end of 5. of the regulatory period for consumption points in the city of Trnava, the decision no. 0114/2020/T dated 30.10.2020 in the wording of decision no. 0104/2021/T dated 04.05.2021 in the wording of decision no. 0127/2022/T dated 16.12.2021 and as amended by decision no. 0358/2022/T dated 28.09.2022

Pricing Decision No. 0380/2022/T dated 11.11.2022 with effect from 1 December 2022 until the end of 5. regulatory period, for consumption points in the Bratislava – Staré Mesto, Ružinov, Karlova Ves and Petržalka districts, for consumption points in the Bratislava – Podunajské Biskupice and Vrakuňa districts, for sampling points in the town of Malacky for sampling points in the municipality of Báhoň for sampling points in the municipality of Lehota pod Vtáčnikom for sampling points in the town of Pezinok for sampling points in the town of Košice for sampling points in the municipality of Veľké Kapušany for sampling points in the municipality of Kanianka m e n í Decision No. 0375/2017/T of 14.06.2017 as amended by Decision No. 0132/2019/T of 10.12.2018 as amended by Decision No. 0207/2019/T of 15.07.2019 as amended by Decision No. 0303/2021/T of 07.09.2021 as amended by Decision No. 0130/2022/T of 16.09.2021 as amended by Decision No. 0130/2022/T of 16.09.2021 as amended by Decision No. 0130/2022/T of 16.09.2021 as amended by Decision No.0260/2022/T of 25.04.2022 as amended by Decision No. 0273/2022/T of 03.05.2022 as amended by Decision No. 0306/2022/T of 28.07.2022 and as amended by Decision No. 0359/2022/T of 28.09.2022

Pricing Decision No. 0378/2022/T dated 11.11.2022 with effect from 1. December 2022 by the end of 5. Regulatory for consumption points in the city of Bratislava – Nové Mesto has the decision 0208/2019/T dated 15.07.2019 in the wording of the decision no. 0147/2021/T dated 07.09.2021 in the wording of decision no. 0128/2022/T dated 16.12.2021 in the wording of the decision no. 0261/2022/T dated 25.04.2022 and as amended by decision no. 0356/2022/T dated 28.09.2022

Pricing Decision No. 0377/2022/T dated 11.11.2023 with effect from 1 December 2022 until the end of the 5th regulatory for the sampling points in the Bratislava – Devínska Nová Ves and Záhorská Bystrica districts, the decision No. 0087/2020/T dated 24.01.2020, as amended by the decision No. 0095/2021/T dated 05.03.2021, as amended by the decision No. 0129/2022/T dated 16.12.2021 and as amended by the decision No. 0355/2022/T dated 28.09.2022, shall be amended by the decision No. 0129/2022/T dated 16.12.2021.

Pricing Decision Number: 0130/2025/T for the period from 01. 01. 2025 to 31. 12. 2027 amends Decision No. 0167/2024/T of 19. 12. 2023

for consumption points in Senica, Senica, Smrdáky, Gbely, Holič, Skalica

Pricing Decision Number: 0129/2025/T for the period from 01. 01. 2025 to 31. 12. 2027 amends Decision No. 0173/2024/T of 20. 12. 2023

for consumption points in the Bratislava – Devínska Nová Ves and Záhorská Bystrica districts,

Bratislava – Nové Mesto, Bratislava – Staré Mesto, Ružinov, Karlova Ves and Petržalka, Podunajské Biskupice and Vrakuňa, Malacky, Stupava, Báhoň, Lehota pod Vtáčnikom, Pezinok, Košice, Veľké Kapušany,

in the village of Kanianka, in the town of Trnava.

Permissions

Permit for production and distribution of heat, 62. change
Electricity business licence, 3rd amendment

Cancellation of heat production permit / SKAL&CO

Data permissions

Confirmation of notification obligation – KGJ Stavbárska, Bratislava

Publication of data for KGJ Stavbárska for the year 2025

Eligible measurement reports

PK Žriedlová 18 (after boiler replacement)

PK Žriedlová 18

PK Žriedlová 13

PK Žriedlová 7

KGJ in CZT Odborárska Bratislava

Pricing Decision No. 0131/2025/E-KV for KGJ Stavbárska 12, Bratislava, for the period from 08. 12. 2025 to 31. 12. 2027 fixed electricity price for the determination of the surcharge of 101,22 €/MWh

Pricing Decision No.0051/2026/E-KV “KGJ in the boiler house CZT Odborárska Bratislava” for the period: 01.01.2026 – 31.12.2027 fixed electricity price: 108,07 €/MWh

Pricing Decision No: 0108/2025/E-KV for the period from 01.01.2025 to 31.12.2025, where the fixed price of electricity for the determination of the surcharge is set at EUR 156.18/MWh for the electricity producer’s installation “KGJ in the boiler house CZT Odborárska Bratislava”.

This Decision amends Decision No 0141/2024/E-KV of 12.12.2024, while leaving the other parts of the operative part unchanged.
It forms an integral part of Decision No 0141/2024/E-KV of 12.12.2024.

Pricing decision number: 0141/2024/E-KV for the period from 09. 12. 2024 until 31. 12.2027 fixed electricity price for the determination of the surcharge in the amount of 144,50 Euro/MWh, for the electricity producer’s installation “KGJ in the boiler house CZT Odborárska Bratislava”

Data publication – KGJ Odborárska Bratislava for the year 2024

Data disclosure – KGJ Odborárska Bratislava for the year 2025

Pricing Decision No. 0229/2023/T / SKAL&CO, dated 28.12.2022 for the period from 1 January 2023 to 31 December 2023 with validity until the end of the 6th regulatory period for consumption points in the town of Gbely, Holič, Skalica

Reconstruction of secondary distribution of central heating and hot water – OST 1, Službyt, s.r.o. Senica (pdf)

Cancellation of a heat production permit / Službyt, s.r.o.

Pricing Decision No. 0239/2023/T / Službyt, s.r.o. dated 19.12.2022, for the period from 1. January 2023 to 31. December 2023, valid until the end of 6. of the regulatory period, for consumption points in the town of Senica for consumption points in the municipality of Smrdáky

Pricing Decision No. 0358/2022/T dated 28.09.2022 valid from 1. October 2022 by the end of 5. of the regulatory period for consumption points in the city of Trnava, the decision No 0114/2020/T of 30.10.2020 as amended by the decision No 0104/2021/T of 04.05.2021 and as amended by the decision No 0127/2022/T of 16.12.2021, shall be amended by the decision No 0127/2022/T of 16.12.2021
Pricing Decision No. 0359/2022/T dated 28.09.2022 valid from 1 October 2022 until the end of 5. of the regulatory period for consumption points in the Bratislava – Staré Mesto, Ružinov, Karlova Ves and Petržalka districts, for consumption points in the Bratislava – Podunajské Biskupice and Vrakuňa districts, for consumption points in the town of Malacky, for sampling points in the municipality of Báhoň, for sampling points in the municipality of Lehota pod Vtáčnikom, for sampling points in the town of Pezinok, for sampling points in the town of Košice, for sampling points in the municipality of Veľké Kapušany, for sampling points in the municipality of Kanianka, amends Decision No. 0375/2017/T of 14.06.2017, as amended by Decision No. 0132/2019/T of 10.12.2018, as amended by Decision No. 0207/2019/T of 15.07.2019, as amended by Decision No. 0303/2021/T of 07.09.2021, as amended by Decision No. 0130/2022/T of 16.12.2021, as amended by Decision No. 0260/2022/T of 25.04.2022, as amended by Decision No. 0273/2022/T of 03.05.2022, and as amended by Decision No. 0306/2022/T dated 28.07.2022
Pricing Decision No. 0356/2022/T dated 28.09.2022, valid from 1 October 2022 until the end of the 5th regulatory period for the consumption points in the city of Bratislava – Nové Mesto, amending Decision 0208/2019/T dated 15.07.2019 as amended by Decision No. 0147/2021/T dated 07.09.2021 as amended by Decision No. 0128/2022/T dated 16.12.2021 and as amended by Decision No. 0261/2022/T dated 25.04.2022
Pricing Decision No. 0355/2022/T dated 28.09.2022, valid from 1 October 2022 until the end of the 5th regulatory period for consumption points in the Bratislava – Devínska Nová Ves and Záhorská Bystrica districts, amended by Decision No. 0087/2020/T dated 24.01.2020, as amended by Decision No. 0095/2021/T dated 05.03.2021 and as amended by Decision No. 0129/2022/T dated 16.12.2021
Pricing Decision No. 0306/2022/T dated 28.07.2022 valid from 1 August 2022 to 31 December 2022 for the off-take points in the Bratislava – Podunajské Biskupice and Vrakuňa districts for the off-take points in the town of Malacky for the off-take points in the town of Pezinok, amends Decision No. 0375/2017/T of 14.06.2017, as amended by Decision No. 0132/2019/T of 10.12.2018, as amended by Decision No. 0207/2019/T of 15.07.2019, as amended by Decision No. 0303/2021/T of 07.09.2021 and as amended by Decision No. 0130/2022/T of 16.12.2021
Pricing Decision No. 0273/2022/T No 0375/2017/T of 14.06.2017 as amended by Decision No 0132/2019/T of 10.12.2017, valid from 3.05.2022 to 31.12.2022 for the consumption points in the municipality of Kanianka , shall be replaced by Decision No 0375/2017/T of 14.06.2017 as amended by Decision No 0132/2019/T of 10.12.0207/2019/T of 15.07.2019, as amended by Decision No 0303/2021/T of 07.09.2021, as amended by Decision No 0130/2022/T of 16.12.2021 and as amended by Decision No 0260/2022/T of 25.04.2022
Pricing Decision No. 0260/2022/T dated 25.4.2022, valid from 1 May 2022 to 31 December 2022 for the consumption points in the Bratislava – Staré Mesto, Ružinov, Karlova Ves and Petržalka districts” shall replace the decision No 0375/2017/T dated 14.06.2017, as amended by Decision No 0132/2019/T of 10.12.2018, as amended by Decision No 0207/2019/T of 15.07.2019, as amended by Decision No 0303/2021/T of 07.09.2021 and as amended by Decision No 0130/2022/T of 16.12.2021
Pricing Decision No. 0261/2022/T dated 25.4.2022, valid from 1 May 2022 to 31 December 2022 for the off-take points in the city of Bratislava – Nové Mesto” shall replace Decision 0208/2019/T dated 15.07.2019 as amended by Decision No. 0147/2021/T dated 07.09.2021 and Decision No. 0128/2022/T dated 16.12.2021
Pricing Decision No. 0130/2022/T dated 16.12.2021, valid from 1 January 2022 to 31.12.2022 for consumption points in the Bratislava – Staré Mesto, Ružinov, Karlova Ves and Petržalka districts, for consumption points in the Bratislava – Podunajské Biskupice and Vrakuňa districts, for consumption points in the town of Malacky, for consumption points in the municipality of Lehota pod Vtáčnikom, for consumption points in the town of Pezinok, for consumption points in the municipality of Veľké Kapušany, amends Decision No. 0375/2017/T of 14.06.2017, as amended by Decision No. 0132/2019/T of 10.12.2018, as amended by Decision No. 0207/2019/T of 15.07.2019, and as amended by Decision No. 0303/2021/T of 07.09.2021
Pricing Decision No. 0129/2022/T of 16.12.2021, valid from 1 January 2022 to 31.12.2022 for the consumption points in the Bratislava – Devínska Nová Ves and Záhorská Bystrica districts, amends Decision No. 0087/2020/T of 24.01.2020, as amended by Decision No. 0095/2021/T of 05.03.2021
Pricing Decision No. 0128/2022/T dated 16.12.2021, valid from 1 January 2022 to 31.12.2022 for the consumption points in the city of Bratislava – Nové Mesto amends Decision 0208/2019/T dated 15.07.2019 as amended by Decision No 0147/2021/T dated 07.09.2021
Pricing Decision No. 0127/2022/T dated 16.12.2021, valid from 1 January 2022 to 31.12.2022 for consumption points in the city of TRNAVA, amends the decision no. 0114/2020/T dated 30.10.2020 in the wording of decision no. 0104/2021/T dated 04.05.2021
Pricing Decision No. 0303/2021/T dated 7.09.2021 until 31.12.2022 (This Decision forms an integral part of Decision No 0375/2017/T of 14.06.2017, as amended by Decision No 0132/2019/T of 10.12.2018 and Decision No 0207/2019/T of 15.07.2019)
Pricing Decision No. 0147/2021/T dated 7.09.2021 until 31.12.2022 (for consumption points in the city of Bratislava – Nové Mesto) This Decision forms an integral part of Decision No 0208/2019/T of 15.07.2019.
URSO Price Decision No. 0104/2021/T (dated 04.05.2021, valid from 04.05.2021 until the end of the 5th regulatory period for consumption points in the city of TRNA VA

Quality standards for heat, 2024

Quality standards for heat, 2024

Quality standards for heat, 2023
Quality standards for heat, 2022

Quality Standards 2023 / SKAL&CO
Quality Standards 2022 / SKAL&CO

Quality Standards 2023 / Službyt
Quality Standards 2022 / Službyt

Customer Satisfaction Assessment 2025

Customer Satisfaction Questionnaire Evaluation 2024

Termming Distribution System Operator’s Operating Rules
Technical conditions of the local distribution system operator Termming, EcoPoint Office Center, Košice effective from 03.03.2016

Terms and conditions of electricity supply
Terms and conditions of electricity supply in the provision of universal service for small enterprises, No. 0015/2016/E-OP