Energy
Start of activity
1997
Total installed power
18,80 MW
Installed capacity: biomass
5 MW
Annual heat production
12.3 GWh
Number of boiler rooms
3
Length of wiring
8 km
Cogeneration unit
184 kW
Services provided
- Production and distribution of heat and hot water
- Production and supply of electricity by equipment up to 1 MW
Service messages
Contact
IČO: 36173061
DIČ: 2020041617
IČDPH:SK2020041617
Bank connection:
IBAN SK08 7500 0000 0001 2578 5913
Disclosure:
Reconstruction of heat and hot water distribution systems in Moldava nad Bodvou, 7/2020 – 1/2021 (pdf)
Reconstruction of heat and hot water distribution systems in Moldava nad Bodvou, 7/2020 – 11/2021 (pdf)
Heat production permit, 9th amendment
Certificate of origin of electricity number 0005/2024/PoP-KV – KGJ Bartalošova 14, Moldava nad Bodvou
Certificate of origin of electricity number 0048/2023/PoP-KV – KGJ Bartalošova 14, Moldava nad Bodvou
Certificate of origin of electricity number: 0059/2022/PoP-KV– KGJ Bartalošova 14, Moldava nad Bodvou
Price Decision No.0138/2024/T dated 13.12.2023 from 1 January 2024 to 31 December 2024 with validity until the end of the 6th regulatory period for off-take points in the municipality of Moldava nad Bodvou
Price Decision No.0150/2024/T dated 13.12.2023 with effect from 1 January 2024 until the end of the 6th regulatory period of the m e n i No. 0220/2023/T dated 19.12.2022 for the Moldava nad Bodvou off-take points
Price decision of URSO Number: 0176/2023/E-OZ from 02.11.2023 until the end of the 6th regulatory period fixed price of electricity for the determination of the surcharge “Biogas station Moldava nad Bodvou”
Price Decision No 0064/2025/E-KV , Fixed price of electricity for the determination of the surcharge (KGJ ) of 21.10.2024 , KGJ CENTO – 180″, Bartalošova 14, 045 01 Moldava nad Bodvou for the period from 01.01.2025 to 31.12.2025 amends Decision No 0079/2023/E-KV of 25.10.2022, as amended by Decision No 0067/2024/E-KV of 10.11.2023
Price Decision No. 0220/2023/T dated 19.12.2022 , for the period from 1 January 2023 to 31 December 2023 with validity until the end of the 6th regulatory period, for off-take points in the town of Moldava nad Bodvou
Price Decision No 0079/2023/E-KV “Fixed price of electricity for the determination of the surcharge (KGJ ) of 25.10.2022, KGJ CENTO – 180”, Bartalošova 14, 045 01 Moldava nad Bodvou for the period from 01.01.2023 to the end of the 6th regulatory period
Pricing Decision No 0351/2022/T dated 27.09.2022, valid from 1 October 2022 until the end of the 5th regulatory period for off-take points in the town of Moldava nad Bodvou, amending Decision No 0208/2017/T dated 25.11.2016, as amended by Decision No 0114/2019/T dated 05.12.2018, as amended by Decision No 0177/2021/T dated 06.09.2021, as amended by Decision No 0086/2022/T dated 06.12.2021, and as amended by Decision No 0284/2022/T dated 09.06.2022.
Price Decision No. 0284/2022/T dated 9.06.2022 valid from 1 July 2022 to 31 December 2022 for consumption points in the town of Moldava nad Bodvou.” mends Decision No 0208/2017/T of 25.11.2016, as amended by Decision No 0114/2019/T of 05.12.2018, as amended by Decision No 0177/2021/T of 06.09.2021 and as amended by Decision No 0086/2022/T of 06.12.2021
Price Decision No. 0086/2022/T dated 6.12.2021 valid from 1 January 2022 until the end of the 5th regulatory period, amends Decision No 0208/2017/T of 25.11.2016 as amended by Decision No 0114/2019/T of 05.12.2018 and Decision No 0177/2021/T of 06.09.2021
Price Decision No. 0177/2021/T dated 6.09.2021 until 31.12.2022 , this decision forms an integral part of Decision No 0208/2017/T of 25.11.2016 as amended by Decision No 0114/2019/T of 05.12.2018
Price Decision No. 0110/2022/E-KV, Fixed price of electricity for the determination of the surcharge (valid from 1.1.2022 to 31.12.2022, KGJ Bartalošova 14, Moldava nad Bodvou)
Price Decision No 0075/2021/E-KV, Fixed electricity price for the determination of the surcharge (28.5.2021-end of the 5th regulatory period), KGJ Bartalošova 14, Moldava nad Bodvou)
Publication of data for KGJ for 2024
Publication of data for KGJ 2023
Publication of data for the 2022 KGJ
Publication of data for KGJ for 2021
Confirmation of compliance with the notification obligation No 0139/2021/E-PT dated 15.7.2021, Cogeneration unit TEDOM Cento 180, date of start of operation 4.7.2009
Quality Standards 2023
Quality Standards 2022
Quality Standards 2021