Energy
Start of activity
1997
Total installed power
18,80 MW
Installed capacity: biomass
5 MW
Annual heat production
12.3 GWh
Number of boiler rooms
3
Length of wiring
8 km
Cogeneration unit
184 kW
Services provided
- Production and distribution of heat and hot water
- Production and supply of electricity by equipment up to 1 MW
Service messages
Contact
IČO: 36173061
DIČ: 2020041617
IČDPH:SK2020041617
Bank connection:
IBAN SK08 7500 0000 0001 2578 5913
Disclosure:
Reconstruction of heat and hot water distribution systems in Moldava nad Bodvou, 7/2020 – 1/2021 (pdf)
Reconstruction of heat and hot water distribution systems in Moldava nad Bodvou, 7/2020 – 11/2021 (pdf)
Heat production permit, 9. change
Certificate of origin of electricity number 0004/2025PoP-KV– KGJ Bartalošova 14, Moldava nad Bodvou
Certificate of origin of electricity number 0005/2024/PoP-KV – KGJ Bartalošova 14, Moldava nad Bodvou
Certificate of origin of electricity number 0048/2023/PoP-KV – KGJ Bartalošova 14, Moldava nad Bodvou
Certificate of origin of electricity number: 0059/2022/PoP-KV– KGJ Bartalošova 14, Moldava nad Bodvou
Price Decision No.0083/2026/E-KV “Cogeneration unit CENTO – 180” (0,184 MW, Bartalošova 14, Moldava nad Bodvou) period: 01.01.2026 – 31.12.2027 fixed electricity price: 100,92 €/MWh
Price decision no.0138/2024/T dated 13.12.2023 from 1. January 2024 to 31. December 2024 with validity until the end of the 6th regulatory period for off-take points in the municipality of Moldava nad Bodvou
Price Decision No.0150/2024/T dated 13.12.2023 with effect from 1. January 2024 by the end of 6. of the regulatory period No. 0220/2023/T dated 19.12.2022 for the Moldava nad Bodvou sampling points
Price decision URSO Number: 0176/2023/E-OZ from 02. 11. 2023 by the end of 6. the fixed electricity price for the regulatory period for the determination of the surcharge “Biogas station Moldava nad Bodvou”
Price Decision of the Office of the Regulatory Office of the Czech Republic No.
0064/2025/E-KV , Fixed price of electricity for the determination of the surcharge (KGJ ) of 21.10.2024 , KGJ CENTO – 180″, Bartalošova 14, 045 01 Moldava nad Bodvou for the period from 01. 01. 0079/2023/E-KV of 25.10.2022, as amended by Decision No 0067/2024/E-KV of 10.10.2022, as amended by Decision No 0067/2024/E-KV of 10.12.2025. 11. 2023
Pricing Decision No.
0220/2023/T dated 19.12.2022 , for the period from 1 January 2023 to 31 December 2023 with validity until the end of the 6th regulatory period, for off-take points in the town of Moldava nad Bodvou
Price Decision of the Office of the Regulatory Office of the Czech Republic No.
0079/2023/E-KV “Fixed price of electricity for the determination of the surcharge (KGJ ) of 25.10.2022, KGJ CENTO – 180”, Bartalošova 14, 045 01 Moldava nad Bodvou for the period from 01. 01. 2023 by the end of 6. regulatory period
Pricing Decision No.
0351/2022/T dated 27.09.2022 valid from 1. October 2022 by the end of 5. of the regulatory period for off-take points in the town of Moldava nad Bodvou, m e n d i n g Decision No 0208/2017/T of 25.11.2016 as amended by Decision No 0114/2019/T of 05.12.2018 as amended by Decision No 0177/2021/T of 06.09.2021 as amended by Decision No 0086/2022/T of 06.12.2021 and as amended by Decision No 0284/2022/T of 09.06.2022
Pricing Decision No.
0284/2022/T dated 9.06.2022 valid from 1 July 2022 to 31 December 2022 for consumption points in the town of Moldava nad Bodvou.” mends Decision No 0208/2017/T of 25.11.2016, as amended by Decision No 0114/2019/T of 05.12.2018, as amended by Decision No 0177/2021/T of 06.09.2021 and as amended by Decision No 0086/2022/T of 06.12.2021
Pricing Decision No.
0086/2022/T dated 6.12.2021 valid from 1 January 2022 until the end of the 5th regulatory period, amends Decision No 0208/2017/T of 25.11.2016 as amended by Decision No 0114/2019/T of 05.12.2018 and Decision No 0177/2021/T of 06.09.2021
Pricing Decision No.
0177/2021/T dated 6.09.2021 until 31.12.2022 , this decision forms an integral part of Decision No 0208/2017/T of 25.11.2016 as amended by Decision No 0114/2019/T of 05.12.2018
Pricing Decision No.
0110/2022/E-KV, Fixed price of electricity for the determination of the surcharge (valid from 1.1.2022 to 31.12.2022, KGJ Bartalošova 14, Moldava nad Bodvou)
Pricing Decision No.
0075/2021/E-KV, Fixed price of electricity for the determination of the surcharge (28.5.2021-end of the 5th regulatory period), KGJ Bartalošova 14, Moldava nad Bodvou)
Publication of data for KGJ for 2025
Publication of data for KGJ for 2024
Publication of data for KGJ 2023
Publication of data for the 2022 KGJ
Publication of data for KGJ for 2021
Confirmation of compliance with the notification obligation No. 0139/2021/E-PT dated 15.7.2021, Cogeneration unit TEDOM Cento 180, date of start of operation 4.7.2009