Warning: Undefined array key "file" in /data/c/7/c7e8bb23-be4b-4b1b-a92b-c920574f4eac/engie.sk/web/wp-includes/media.php on line 1763
Warning: Undefined array key "file" in /data/c/7/c7e8bb23-be4b-4b1b-a92b-c920574f4eac/engie.sk/web/wp-includes/media.php on line 1763
Warning: Undefined array key "file" in /data/c/7/c7e8bb23-be4b-4b1b-a92b-c920574f4eac/engie.sk/web/wp-includes/media.php on line 1763
Warning: Undefined array key "file" in /data/c/7/c7e8bb23-be4b-4b1b-a92b-c920574f4eac/engie.sk/web/wp-includes/media.php on line 1763
In recent years, we have successfully connected several new residential and multifunctional buildings to the existing CZT (Centralized Heat Supply) system in Záhorie. The connection was carried out in the towns in which the ENGIE Group operates heat farms – Malacky, Senica, Skalica and Brezová pod Bradlom. Thanks to our projects, the inhabitants of the new houses can enjoy a stable, safe and reliable heat supply.
“In recent years, we have been registering an increased interest among developers or customers operating residential and multifunctional complexes in connecting to the CZT systems in our heating systems. The main reasons for which they turn to us include low investment costs, stability of supply, operation security or favourable energy prices. And, of course, I must not forget the fact that they do not have to build their own heat source. The positive environmental impact and sustainability of such projects is certainly an important aspect,” explains Ivan Mikuš, Head of Energy West at ENGIE Group.
Our reference projects
Multifunctional building Severín, Malacky
- 82 flats
- 2 100 m² multifunctional area (shops, restaurants, offices)
- Underground parking
Connection to the CZT system:
- Elaboration of project documentation
- Obtaining and securing the necessary permits
- Construction of hot water connection (pre-insulated metal pipes)
- Completion of work: 10/2023
- Start of heat supply: 11/2023
Residential houses, housing estate Lúčky, Skalica
- 5 apartment buildings
- 104 flats
Connection to the CZT system:
- Elaboration of project documentation
- Obtaining and securing the necessary permits
- Construction of a hot water connection (four-pipe hot water pipeline made of pre-insulated pipe)
- Connection of 5 apartment buildings: 8/2023
- Start of heat supply: 9/2023
Residential houses on Karvašova street, Skalica
- 2 apartment buildings
- 55 flats
Connection to the CZT system:
- Elaboration of project documentation
- Obtaining and securing the necessary permits
- Construction of a hot water connection (double-pipe hot water from pre-insulated pipe)
- KOST (Compact Heat Transfer Station) installation
- Connecting a solar hot water pre-heating system
- Completion date: 7/2023
- Start of heat supply: 9/2023
Resort of apartment blocks on Sadova Street in Senica
- 2 apartment blocks
- 124 flats
Solution:
- Purchase of gas boiler room for 2 apartment blocks in Senica – 8/2022
- Production and supply of heat for 124 dwellings – from 11/2022
Multifunctional house on Robotnícka Street in Senica
- 6 flats
- 100 m² of multifunctional space
Connection to the CZT system:
- Elaboration of project documentation
- Obtaining and securing the necessary permits
- Construction of hot water connection
- Connection: 4/2024
- Start of heat supply: 9/2024
Residential house with rental apartments, Brezová pod Bradlom
- 38 rental apartments
Connection to the CZT system:
- Elaboration of project documentation
- Obtaining and securing the necessary permits
- Construction of a connection shaft
- Exiting the hot water connection
- Connection: 5/2024
- Start of heat supply: 10/2024
If you are interested in our reference projects and are thinking about connecting your buildings to the district heating system, please contact us. We will be happy to provide you with more information and prepare an offer according to your requirements.
Contact: obchod.sk@engie.com