Energy
Termming, a member of the ENGIE Group in Slovakia, started in May with the planned reconstruction of secondary heat distribution systems. The modernisation of the distribution lines, with a total length of more than 6 km, will be carried out in Bratislava Nové Mesto and should be completed in October this year. The reconstruction will contribute to the reduction of heat losses, minimization of faults and overall efficiency of heat distribution.
Reconstruction of UK and TV secondary distribution systems – Stage I
Stage 1, circuit | Field survey | Commencement of excavation | Completion of excavation | Finishing of the ground surface |
---|---|---|---|---|
OST 869 – Piešt’anská 7 | 20.05. až 27.05.2021 | from 28.05.2021 | until 13.06.2021 | until 27.06.2021 |
OST 870 – Siberian 58 | 10.05. až 17.05.2021 | from 18.05.2021 | until 22.06.2021 | until 06.07.2021 |
OST 871 – Siberian 51 | 23.06 to 30.06.2021 | from 01.07.2021 | until 05.08.2021 | until 19.08.2021 |
OST 872 – Siberian 34 | 23.06 to 30.06.2021 | from 01.07.2021 | until 05.08.2021 | until 19.08.2021 |
OST 873 – Siberian 35 | 05.05. až 12.05.2021 | from 13.05.2021 | until 28.06.2021 | until 12.07.2021 |
OST 874 – Siberian 8 | 10.05. až 17.05.2021 | from 18.05.2021 | until 22.06.2021 | until 06.07.2021 |
OST 875 – Mikovíniho 11 | 23.06 to 30.06.2021 | from 01.07.2021 | until 05.08.2021 | until 19.08.2021 |
OST 876 – Račianska 15 | 27.06 to 04.07.2021 | from 05.07.2021 | until 09.08.2021 | until 23.08.2021 |
OST 877 – Račianska 3 | 30.07. až 06.08.2021 | from 07.08.2021 | until 11.09.2021 | until 25.09.2021 |
OST 888 – Belehradská | 10.05. až 17.05.2021 | from 18.05.2021 | until 22.06.2021 | until 06.07.2021 |
OST 2115 – Kováčska3 | 10.05. až 17.05.2021 | from 18.05.2021 | until 22.06.2021 | until 06.07.2021 |
OST 2117 (617) – Kominárska 4 | completed in 2020 | completed in 2020 | completed in 2020 |
Reconstruction of secondary distribution lines of UK and TV – II. stage
Stage 2, circuit | Field survey | Commencement of excavation | Ditching the excavation | Finishing of the ground surface |
---|---|---|---|---|
OST 854 – Vajnoraská 28 | 23.06 to 30.06.2021 | from 01.07.2021 | until 05.08.2021 | until 19.08.2021 |
OST 856 – Hálkova 48 | 23.06 to 30.06.2021 | from 01.07.2021 | until 22.07.2021 | until 05.08.2021 |
OST 880 – Elementary school Česká 10 | 19.07 to 26.07.2021 | from 27.07.2021 | until 31.08.2021 | until14.09.2021 |
OST 882 – Družstevná 7 | 19.07 to 26.07.2021 | from 27.07.2021 | until 31.08.2021 | until14.09.2021 |
Reconstruction of secondary distribution lines UK and TV: Interruption of hot water supply will be from 8.00 a.m. on the day of the start of the outage NOT to be interrupted until 8.00 p.m. on the day of the end of the outage.
OST869 branch 1 (Š1 – OST869 Piešt’anská 7) – 1.6.2021 – 7.6.2021
OST869 branch 2 (II.KB Sibírska 63 – BN2 Piešt’anská 5) – 2.6.2021 – 8.6.2021
- Piešt’anská 5, 7
- Piešt’anská 1, 3
- Kyjevska 2, 4
- Siberian 53 – 65
OST870 outage in the period 3.6.2021 – 12.6.2021
- Racianska 61, 63, 65
Kováčska 3 – OST 2115 from 7.6.2021 to 12.6.2021
- Šancova 108
- Šancova 102
- Belehradska 8-10
- Belehradska 4-6
- Kováčska 1-2-3
- Legionárska 17-21
- Legionárska 23-25
Belehradská – OST 888 from 14.6.2021 to 19.6.2021
- Belehradska 1-3-5-7
- Jiskrova 4
- Jiskrova 6-8
OST873 branch 1 (I. BN Sibírska 35 – I. KB Račianska 39) – 7.6.2021 – 16.6.2021
OST873 branch 2 (II. BN Sibírska 35 – II. KB Šuňavcova 13) – 11.6.2021 – 18.6.2021
- Racianska 35-39
- Racianska 41
- Racianska 43
- Šuňavcová 5-11
- Schooner 1-3
- Sibirska 18-24
- Siberian 31-37
- Ľublanská 4-10
- American 3-9
- Šuňavcova 13 Primary School and Kindergarten Sibírska 3
Sibírska 8 – OST874 branch 1 (I. BN Sibírska 8 – I. KB Kraskova 2) – 4.6.2021 – 12.6.2021
Sibírska 8 – OST874 branch 2 (II. BN Sibírska 8 – II. KB Sibírska 25) – 6.6.2021 – 12.6.2021
- Ukrainska 2-8
- Sibirska 8-14
- Siberian 21-27
- Kraskova 4-10
- Račianska 27-31 Kraskova 2
OST 854 – Vajnorská 28, from 5.7.2021 to 10.7.2021
- Vajnorská 22, 24, 26-30
- By the old dustbin 1, 3
- Bartoškova 3-5, 7
OST 856 – Hálkova 48, from 5.7.2021 to 10.7.2021
- Hálkova 46-52
- Pavlovská 1-7
Circuit OST 871
- Legerského 10,12,14 16, 18 / Ovručská 11,13 (branch 1) – from 13.7. – 21.7.2021
- Ovručská 12,14 (Branch 2) – from 18.7. – 22.7.2021
Circuit OST 872
- Legerského 2,4,6,8 / Ovručská 1,3,7,9 / Račianska 47,49,51 (Branch 1) – from 20.7. – 31.7.2021
- Sibirska 36,38,40,42 / Ovručská 2,4,6,8,10 (Branch 2) – from 29.7 – 6.8.2021
Circle 875
- Mikovíniho 5,7 (Branch 1) – from 4.8 – 6.8.2021
Circle 876
- J.C. Hronského 16 -18 -20 -22 / Sibírska 4-6 (Branch 2) – from 5.8 – 10.8.2021
- Račianska 21,23,25 (Branch 1) – from 5.8 – 13.8.2021
OST 880-ZŠ Česká 10
- Česká 11,13, Plzenská 11, Česká 5-7-7A, Kindergarten Osadná 5, Primary School Česká 10, Gymnasium Česká 10 – from 05.08.2021 – 12.08.2021
- Budyšínska 12-18, Budyšínska 6, Budyšínska 8-10, Osadná 9 – from 10.08.2021 – 18.08.2021
- Yard – parking lot, Budyšínska 6 will be excavated in the period – 5.8.2021 – 19.8.2021
OST 882 -Družstevná 7
- Kalinčiakova 2,4 – from 11.08.2021 – 17.08.2021
- Trnavská 17,19, 21, 23, Pri St. prachárni 14, 16, 18 – from 17.08.2021 – 26.08.2021
OST 877 – Račianska 3
- Račianska 11, 13 – from 17.08.2021 – 20.08.2021
- Sibírska 1, 3, 5, J.C.Hronského 2,4,6,8,10,12-14 – from 17.08.2021 – 20.08.2021
Contact person for implementation:
Ing. Marek Haluska / + 421 911 266 017 / marek.haluska@engie.com
DOCUMENTATION
Capital City Council: permission for excavation of land owned by the city – 1.
Capital City Council: permission for excavation of land owned by the city – 2.
OÚ ŽP Nature and landscape protection: opinion on the felling of trees
OÚ ŽP: Opinion on the planned felling of trees
Municipal district BA Nové Mesto: permission for building modifications and repairs of TH Nové Mesto,
Municipal district BA Nové Mesto: permission for building modifications and repairs TH Nové Mesto, 2.
Municipal district BA Nové Mesto: Notification of construction modifications – circuit OST 869
Municipal district BA Nové Mesto: Notification of building modifications – all OST circuits
Date of excavations TH Nové Mesto – 1.
Date of excavations TH Nové Mesto – 2.