Project: cooling of the new Manroland printing machine
Project duration: april 2018 – june 2018
Installed equipment: machine room cooling with installation of the BlueBox Tetris 2 SLN FC compact cooler
Equipment power: Qch=336,7 kW (at heat.

Scope of services:
– Solution design, supply, installation and servicing of cooling equipment.

Project specification:
– Cooling to precise temperatures on individual cooling circuits according to the specific needs of the printing machine.