Project: construction of photovoltaic power plant ENGIE (450 kWp) in Senica

Goal of construction: to suitably supplement the local distribution system of ENGIE in Senica with its own electricity production, and thus at the same time to increase the share of the use of renewable energy sources in the ENGIE Group in Slovakia.

Preparation of project documentation: april – july 2022

Start of construction: july 2022

Completion of construction: december 2022

Commissioning: january 2023

Ground part

  • 654 photovoltaic panels with an output of 540 Wp
  • Slope: 30 degrees
  • Total power: 353.16 kWp

Roof

  • 180 photovoltaic panels with an output of 540 Wp
  • Slope: 10 degrees
  • Total power: 97.2 kWp