Project: construction of photovoltaic power plant ENGIE (450 kWp) in Senica
Goal of construction: to suitably supplement the local distribution system of ENGIE in Senica with its own electricity production, and thus at the same time to increase the share of the use of renewable energy sources in the ENGIE Group in Slovakia.
Preparation of project documentation: april – july 2022
Start of construction: july 2022
Completion of construction: december 2022
Commissioning: january 2023
Ground part
- 654 photovoltaic panels with an output of 540 Wp
- Slope: 30 degrees
- Total power: 353.16 kWp
Roof
- 180 photovoltaic panels with an output of 540 Wp
- Slope: 10 degrees
- Total power: 97.2 kWp