Project: purchase, modernisation and operation of a biogas plant

Start of operation: may 2024

Technical information:

Installed capacity:

  • Electrical power: 999 kWe
  • Thermal output: 1 127 kW

Biogas production: 3 500 000 m3/year

Planned annual energy production

  • Electricity: 6 500 MWh/year
  • Heat: 7 300 MWh/year

Start of operation: may 2024

Intent

The operation of BPS Moldava ensures the production of electricity, which is supplied to the public grid and is also used for own consumption in the technological process. The produced heat is used in the thermal economy in Moldava nad Bodvou.