Back

District heating management, Malacky


Installed power: 23.27 MW
• natural gas: 18.27 MW
• biomass: 5 MW
• cogeneration of heat and electricity: 0.828 MWt, 0.699 MWe 
 

Length of pipes: 10 km
Heating substations: 13

Investment into modernization: 7.2 mil. €

Back