Project: Construction of ENGIE Photovoltaic Power Plant (450 kWp) in Senica

The main aim: Appropriately supplement the local distribution system of ENGIE in Senica with its own electricity production, and thereby increase the share of the use of renewable energy sources in the ENGIE Group in Slovakia

Preparation of project documentation: April – July 2022

Start of construction: July 2022

Completion of construction: December 2022

Start of operation: January 2023

Ground:

  • 654 photovoltaic panels with a power of 540 Wp
  • Total power: 353.16 kWp

Roof:

  • 180 photovoltaic panels with a power of 540 Wp
  • Total power: 97.2 kWp