MAGNA PT, Kechnec

Project: Delivery and installation of technical equipment for extension of the technical building at the MAGNA PT plant.
Duration: December 2015 – September 2016
Installed equipment: Compressor and cooling tower with power of 4035 kW
Scope of services:
• Delivery and installation of technical equipment and its connection to existing technical distribution systems, electrical installation, measurement and regulations.

Project: Adjustment of the HVAC system in MAGNA PT Kechnec production hall
Duration: December 2016 – June 2017
Installed equipment: 2 air handling units with power of 140.00 m3/h and 870 kW
Scope of services:
• Installation of steel construction and air handling units on the roof of the building, including connections to existing ducts and systems, electrical installation, measurement and regulation.

Project specifics:
• Installation involved the use of a helicopter during full plant operations