{"id":10861,"date":"2026-02-03T14:52:16","date_gmt":"2026-02-03T13:52:16","guid":{"rendered":"https:\/\/engie.sk\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/"},"modified":"2026-02-03T14:56:06","modified_gmt":"2026-02-03T13:56:06","slug":"modernisation-of-the-heat-management-in-senica-for-7-4-million-euro","status":"publish","type":"post","link":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/","title":{"rendered":"Modernisation of the heat management in Senica for 7.4 million euro"},"content":{"rendered":"\n<p><strong><a href=\"https:\/\/engie.sk\/en\/termming-a-s\/\">Termming<\/a>, a member of the <a href=\"https:\/\/engie.sk\/en\/engie-in-slovakia\/\">ENGIE Group<\/a>, in agreement with the town of Senica, is preparing an extensive modernisation of the central heating supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.<\/strong><\/p>\n<p><strong><a href=\"https:\/\/engie.sk\/en\/heat-and-cold-production-for-cities\/\">The modernisation of the system<\/a>, worth<\/strong> <strong>EUR 7.4 million excluding VAT<\/strong>, will be financed mainly from the Modernisation Fund, which can cover up to 85% of the investment. The remainder will be paid by Termming from its own resources. As a result, the project is being implemented without significant financial impact on the city or residents.<\/p>\n<p>The modernisation project concerns not only the wood chip boiler house on Tov\u00e1rensk\u00e1 Street, but also the entire hot water system supplying residential houses and public buildings.<\/p>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-10856\" src=\"https:\/\/engie.sk\/wp-content\/uploads\/IMG_3485.jpg\" alt=\"\" width=\"2500\" height=\"1667\"><\/p>\n<p><strong><a href=\"https:\/\/engie.sk\/en\/design-build-method\/\">Modernisation<\/a> involves three main steps:  <\/strong><\/p>\n<ul>\n<li>construction of new primary heat distribution lines (1 679 m) to connect the gas boiler rooms and engine rooms of Primary School III and Primary School IV with the Municipal Heating Plant,<\/li>\n<li>reconstruction of gas boiler houses to heat transfer stations and modernisation of heat transfer stations for schools,<\/li>\n<li>renewal of secondary heat distribution lines (3 699 m).<\/li>\n<\/ul>\n<p>For the residents, this means <strong>more comfort, a more stable system with a longer service life, fewer breakdowns and better control of the heat supply<\/strong>. An important benefit of the modernisation will be in particular the <strong>stabilisation of heat prices.<\/strong> <\/p>\n<p>The project also has a strong environmental dimension. It will increase the proportion of heat produced from wood chips and reduce dependence on natural gas. <strong>Approximately 1 600 tonnes of carbon dioxide will be saved annually in Senica, which<\/strong> will contribute to cleaner air and a healthier environment. <\/p>\n<p><strong>The implementation of the project is planned for 2026<\/strong>. The works will be organised in such a way that any restrictions in hot water supply will be as small as possible for households. <\/p>\n<p>The modernisation of the central heat supply is an important step towards a sustainable and energy efficient Senica. It confirms that investments in modern and environmentally friendly solutions can bring concrete benefits for people &#8211; lower environmental burden, more stable prices and reliable heat supply. <\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Termming, in agreement with the town of Senica, is preparing a large-scale modernisation of the central heat supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.<\/p>\n","protected":false},"author":2,"featured_media":10859,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[128,132,124,133,111],"tags":[],"class_list":["post-10861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-engie-in-slovakia","category-heat-production-and-distribution","category-news","category-technology-installations","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Modernisation of the heat management in Senica for 7.4 million euro - Engie<\/title>\n<meta name=\"description\" content=\"Termming, a member of the ENGIE Group, in agreement with the town of Senica, is preparing an extensive modernisation of the central heating supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modernisation of the heat management in Senica for 7.4 million euro - Engie\" \/>\n<meta property=\"og:description\" content=\"Termming, a member of the ENGIE Group, in agreement with the town of Senica, is preparing an extensive modernisation of the central heating supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/\" \/>\n<meta property=\"og:site_name\" content=\"Engie\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-03T13:52:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-03T13:56:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/engie.sk\/wp-content\/uploads\/IMG_3533b.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"3000\" \/>\n\t<meta property=\"og:image:height\" content=\"1971\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"katarina.frcova\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"katarina.frcova\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/\"},\"author\":{\"name\":\"katarina.frcova\",\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/#\\\/schema\\\/person\\\/3e2df2ae0b1b3454e3322d3580910029\"},\"headline\":\"Modernisation of the heat management in Senica for 7.4 million euro\",\"datePublished\":\"2026-02-03T13:52:16+00:00\",\"dateModified\":\"2026-02-03T13:56:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/\"},\"wordCount\":364,\"image\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/engie.sk\\\/wp-content\\\/uploads\\\/IMG_3533b.jpg\",\"articleSection\":[\"ENGIE in Slovakia\",\"Heat production and distribution\",\"News\",\"Technology installations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/\",\"url\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/\",\"name\":\"Modernisation of the heat management in Senica for 7.4 million euro - Engie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/engie.sk\\\/wp-content\\\/uploads\\\/IMG_3533b.jpg\",\"datePublished\":\"2026-02-03T13:52:16+00:00\",\"dateModified\":\"2026-02-03T13:56:06+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/#\\\/schema\\\/person\\\/3e2df2ae0b1b3454e3322d3580910029\"},\"description\":\"Termming, a member of the ENGIE Group, in agreement with the town of Senica, is preparing an extensive modernisation of the central heating supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/#primaryimage\",\"url\":\"https:\\\/\\\/engie.sk\\\/wp-content\\\/uploads\\\/IMG_3533b.jpg\",\"contentUrl\":\"https:\\\/\\\/engie.sk\\\/wp-content\\\/uploads\\\/IMG_3533b.jpg\",\"width\":3000,\"height\":1971},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/engie.sk\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Modernisation of the heat management in Senica for 7.4 million euro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/engie.sk\\\/en\\\/\",\"name\":\"Engie\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/engie.sk\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/engie.sk\\\/en\\\/#\\\/schema\\\/person\\\/3e2df2ae0b1b3454e3322d3580910029\",\"name\":\"katarina.frcova\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/443c75f24aeb6eb15dc2b61ab53272194f8bca795d527fd2f8d371af86ba985a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/443c75f24aeb6eb15dc2b61ab53272194f8bca795d527fd2f8d371af86ba985a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/443c75f24aeb6eb15dc2b61ab53272194f8bca795d527fd2f8d371af86ba985a?s=96&d=mm&r=g\",\"caption\":\"katarina.frcova\"},\"url\":\"https:\\\/\\\/engie.sk\\\/en\\\/author\\\/katarina-frcova\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Modernisation of the heat management in Senica for 7.4 million euro - Engie","description":"Termming, a member of the ENGIE Group, in agreement with the town of Senica, is preparing an extensive modernisation of the central heating supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/","og_locale":"en_US","og_type":"article","og_title":"Modernisation of the heat management in Senica for 7.4 million euro - Engie","og_description":"Termming, a member of the ENGIE Group, in agreement with the town of Senica, is preparing an extensive modernisation of the central heating supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.","og_url":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/","og_site_name":"Engie","article_published_time":"2026-02-03T13:52:16+00:00","article_modified_time":"2026-02-03T13:56:06+00:00","og_image":[{"width":3000,"height":1971,"url":"https:\/\/engie.sk\/wp-content\/uploads\/IMG_3533b.jpg","type":"image\/jpeg"}],"author":"katarina.frcova","twitter_card":"summary_large_image","twitter_misc":{"Written by":"katarina.frcova","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/#article","isPartOf":{"@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/"},"author":{"name":"katarina.frcova","@id":"https:\/\/engie.sk\/en\/#\/schema\/person\/3e2df2ae0b1b3454e3322d3580910029"},"headline":"Modernisation of the heat management in Senica for 7.4 million euro","datePublished":"2026-02-03T13:52:16+00:00","dateModified":"2026-02-03T13:56:06+00:00","mainEntityOfPage":{"@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/"},"wordCount":364,"image":{"@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/#primaryimage"},"thumbnailUrl":"https:\/\/engie.sk\/wp-content\/uploads\/IMG_3533b.jpg","articleSection":["ENGIE in Slovakia","Heat production and distribution","News","Technology installations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/","url":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/","name":"Modernisation of the heat management in Senica for 7.4 million euro - Engie","isPartOf":{"@id":"https:\/\/engie.sk\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/#primaryimage"},"image":{"@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/#primaryimage"},"thumbnailUrl":"https:\/\/engie.sk\/wp-content\/uploads\/IMG_3533b.jpg","datePublished":"2026-02-03T13:52:16+00:00","dateModified":"2026-02-03T13:56:06+00:00","author":{"@id":"https:\/\/engie.sk\/en\/#\/schema\/person\/3e2df2ae0b1b3454e3322d3580910029"},"description":"Termming, a member of the ENGIE Group, in agreement with the town of Senica, is preparing an extensive modernisation of the central heating supply. The project aims to ensure more reliable heat supply, more stable prices for households and at the same time significantly reduce the burden on the environment.","breadcrumb":{"@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/#primaryimage","url":"https:\/\/engie.sk\/wp-content\/uploads\/IMG_3533b.jpg","contentUrl":"https:\/\/engie.sk\/wp-content\/uploads\/IMG_3533b.jpg","width":3000,"height":1971},{"@type":"BreadcrumbList","@id":"https:\/\/engie.sk\/en\/modernisation-of-the-heat-management-in-senica-for-7-4-million-euro\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/engie.sk\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Modernisation of the heat management in Senica for 7.4 million euro"}]},{"@type":"WebSite","@id":"https:\/\/engie.sk\/en\/#website","url":"https:\/\/engie.sk\/en\/","name":"Engie","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/engie.sk\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/engie.sk\/en\/#\/schema\/person\/3e2df2ae0b1b3454e3322d3580910029","name":"katarina.frcova","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/443c75f24aeb6eb15dc2b61ab53272194f8bca795d527fd2f8d371af86ba985a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/443c75f24aeb6eb15dc2b61ab53272194f8bca795d527fd2f8d371af86ba985a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/443c75f24aeb6eb15dc2b61ab53272194f8bca795d527fd2f8d371af86ba985a?s=96&d=mm&r=g","caption":"katarina.frcova"},"url":"https:\/\/engie.sk\/en\/author\/katarina-frcova\/"}]}},"_links":{"self":[{"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/posts\/10861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/comments?post=10861"}],"version-history":[{"count":0,"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/posts\/10861\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/media\/10859"}],"wp:attachment":[{"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/media?parent=10861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/categories?post=10861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engie.sk\/en\/wp-json\/wp\/v2\/tags?post=10861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}