Project: Punch I. Campus Detva
Company: Punch Property, Punch Precision
Objects: Production hall and warehouse ZF Friedrichshafen SO 02 and administrative building Punch Precision SO 01
Duration: December 2018 – March 2019
Scope of services:
• supply and installation of wiring for production technology,
• delivery and installation of transformer station (power: 2 x 1,6 MVA),
• installation of low-voltage distribution systems,
• fire alarm, voice alarm
• measurement and control.
Projekt: Punch II. Campus Detva
Objects: Production hall and warehouse Punch SO03
Duration: August 2019 – May 2020
Scope of services:
• supply and installation of wiring for production technology,
• installation of lighting for production hall,
• delivery and installation of transformer station (power: 2 x 3,4 MVA),
• installation of low-voltage distribution systems,
• fire alarm, voice alarm
• measurement and control.