The Ondrej Nepela Winter stadium, Bratislava

ENGIE Services participated in the reconstruction of the Ondrej Nepela stadium as part of the preparations for the IIHF World Championship in 2011. ENGIE Services ensured the supply of measurement and control systems, CCTV system, evacuation tannoy systems fire alarm, as well as structured cabling for the transmission of radio and television signals and the civil warning system.