The FNsP Cogeneration unit, Skalica

Cogeneration Heat 

In 2012, within extensive reconstruction of the entire hospital, in which ENGIE Services participated, a modern cogeneration unit with an output of 200 kWe and 277 kWt was installed. ENGIE Services currently operates the cogeneration unit and supplies heat and electricity within the FNsP hospital premises. The cogeneration unit operates in two stages – isolated (energy from own production) and parallel (energy from the network in the case of increased consumption).